DAKOTA MOTORCYCLE CO
SPRINGFIELD, SD
 

About Us
Greg's Body Shop

Projects
Motorcycle
Sailboat
Custom Kelvinator

Contact Us
Phone
    605-369-2768

HOME

 

Progress
2002
January thru February
March thru April
May thru June
July thru August
September thru October
November thru December

2003
January thru February
March thru April
May thru June
July thru August
August 30 and 31
September thru November

2004
October 2004
October 2004 Part 2

The Ship That Sails

 

Progress
May thru June 2002

May
The frames and hull construction are outgrowing the body shop. A temporary shelter on the shop's south side breaks the wind for welding. After some confusion and a visit from the police, the city issues a $2 building permit for the structure.

Tin nailed to several posts enclose the building area. A front gate allows for material/equipment transfer. Rails along the ground hold the frames in place - upside down, while the aluminum is welded to form the hull.

June
The temporary shelter is now complete and the frames are moved outside. Portions of the keel area are visible. At this point in construction, the deck of the boat is facing downward. The rest of the frames will be lined up and secured along the rails in their proper position.

Temporary Shelter 2002

Shelter Posts 2002











Web Design 2007-2010 MediaBasic
Springfield, SD 


October - Nov 2007
Boat positioned and ready for deck work.


October 2007
There she goes toward right side up on
Oct. 20, 2007.


May 2007
The 18,000 pound vertical lifting keel went outside the shop.


March 2007

This winter Greg worked inside on the vertical lifting keel.


Inside
the keel takes shape

The retractable keel gains weight