About Us
Greg's Body Shop
Projects
Motorcycle
Sailboat
Custom Kelvinator
Contact Us
Phone
605-369-2768
HOME
Progress
2002
January
thru February
March thru April
May thru June
July thru August
September thru October
November thru December
2003
January thru February
March thru April
May thru June
July thru August
August 30 and 31
September thru November
2004
October 2004
October 2004 Part 2
The Ship
That Sails |
|
Progress
May thru June 2002
May
The frames and hull construction are outgrowing the body shop. A temporary
shelter on the shop's south side breaks the wind for welding. After some
confusion and a visit from the police, the city issues a $2 building permit
for the structure.
Tin nailed to several posts enclose the building area. A front gate allows
for material/equipment transfer. Rails along the ground hold the frames in
place - upside down, while the aluminum is welded to form the hull.
June
The temporary shelter is now complete and the frames are moved outside.
Portions of the keel area are visible. At this point in construction, the
deck of the boat is facing downward. The rest of the frames will be lined up
and secured along the rails in their proper position.


Web Design 2007-2010 MediaBasic
Springfield, SD |
|

October - Nov
2007
Boat positioned and
ready for deck work.

October 2007
There she goes toward right side up on
Oct. 20, 2007.

May 2007
The 18,000 pound vertical lifting keel went outside
the shop.

March 2007
This winter Greg worked inside on the
vertical lifting keel.

Inside
the keel takes shape
The retractable keel gains
weight

|